ntil beams
o Setup kitchen ventilator and bathroom ventilators
o Sheet centring for beams and also roof
o Fix sheets based on water level
o Apply plaster for the gaps between sheets
o Apply oil for sheets
o Bar bending work for beams and roof
o Inverter beams
o Electric pipes setup inside roof
o Molding
o Storing water on top of the roof
o After 18 days remove sheet centering
o Hocking for the roof if not done for the pillars
o Electric pipes
o Clear any blockage in the roof pipes
o Laying electric pipes in the walls and setup electric boxeso Plumbing work for kitchen and bathroom
o Setup water pipes and sewage pipes till outside of the wall
o Setup Indian latrine if you are going with this option
o Water proofing for bathrooms